The District Shopping Centre, Docklands

2020
The District Docklands Pty Ltd
Australia

Steel Pencil started working on the Steel Detailing for this project in 2019 and finished it off in 2020. It has now been constructed and has become a popular shopping destination in Melbourne, Australia.

Mixed Use Development

2020
Cook Brothers
New Zealand
This project was a combination of steel detailing and pre-cast that allowed our team to demonstrate their skills and completing both areas of work to a high standard. We completed this job for Cook Brother in 2020 for the development of a building in Queenstown. 

Carrapateena Project

2018
Ferretti International
Australia

Steel Pencil secured the construction modelling for the copper-gold mining project located 160km north of Port Augusta in South Australia. The Carrapateena Project is one of Australia’s largest undeveloped copper deposits, the project will be a 4.25 Mtpa underground operation with an estimated mine life of 20 years. Steel Pencil are proud to be selected for this project because of their successful track record including having completed other Oz Minerals projects such as nearby Prominent Hill.

Cairns South Health Facility

2019
CSF Steel
Australia

Steel Pencil did the Steel and Pre-cast detailing for this Health Facility based in Cairns, Australia. This facility was built to withstand a category five cyclone, but still be able to provide interim emergency care and operate as a quality health facility under all circumstances. 

Port of Brisbane

2019
Brady Marine and Civil Pty Ltd
Australia

Steel Pencil was chosen to do the modelling of the wharf in 2019. For this project we were able to work closely with our client in the steel and pre-cast detailing and modelling for this project. Steel Pencil were involved in the detailing for this project in 2019, with the construction latter being finished off in 2020.

Boneo Water Recycling Plant

2020
Jack Engineering
Australia  

Steel Pencil did the detailing for this water recycling plant upgrade in Victoria during 2020. This project consisted of seven buildings originally. Two more buildings were added on our scope afterward. We also did additional two existing buildings for remediation.

Karapiro Gulley Bridge

2014
Eastbridge Ltd
New Zealand
Steel Pencil worked on the structural steel construction modelling of the Karapiro Gully Bridge as part of the Waikato Expressway, Tamahere to Cambridge Upgrade. The project for the 200 metre-long bridge began in 2013, and the construction of it was latter finished off in 2015.

Harbour Town Cinemas

2017
Stilcon Holdings Pty Ltd
Australia
The team at Steel Pencil enjoyed working on the detailing for this project in Melbourne back in 2017. The Harbour Town Cinemas was a large project which included a new eight cinema Hoyts among other exciting retail stores and areas to suit entertainment. The precincts is built next to the Melbourne Star Observation Wheel and O’Brien Group Arena, formerly the Medibank Icehouse, the later a project completed by Steel Pencil several years ago.

Fonterra Lichfield

2014
Ebert Construction Ltd
New Zealand

Our company was awarded the construction modelling for this project in 2014 where were able to detail modelling of stairs and steel structures that were an asset to our client and made for an enjoyable project for our team to work on.

Facebook
LinkedIn